No Project Found
This redevelopment at the O2 Intercontinental Hotel required full MEP services to change the function of the space from an indoor car park to a luxury ballroom and event space.
MultiCAD provided BIM for The Chancery Rosewood hotel at 30 Grosvenor Square, a redevelopment of the Grade II listed US Embassy building in Mayfair, London W1.
MultiCAD are providing full MEP co-ordination, BIM designs and COBie asset inputting for construction of Oasis Restore, the UK’s first secure school.
Started in April 2023, the revamp of New Zealand House in London’s St James’ area will cost in the region of £150 million. The work is due to be complete by the end of 2025, involving collaboration between MultiCAD and a number of other specialist contractors.
MultiCAD are providing MEP services for the NHS National Rehabilitation Centre, located just outside Nottingham.
MultiCAD provided full MEP co-ordination and BIM for the £11 million project at Meadow High School, which is a mixed-gender special educational needs and disabilities (SEND) school, located in Uxbridge.
Co-ordination for a large electrical contractor including full BIM to PAS1192-2 on clients Common Data Environment (CDE) & COBie at each information exchange.
MultiCAD provided Lead Co-ordination with full BIM to PAS1192-2 on clients Common Data Environment (CDE) & COBie at each information exchange.
We were tasked with providing fully coordinated M&E drawings for the contractor to complete refurbishment of the AMU dept. at Barnet Hospital.
We were tasked with providing fully coordinated M&E drawings for the contractor to complete refurbishment of levels 4, 5 & 6 to provide Cat A office space
Sopwell House Spa Extension: we produced a fully coordinated 3D MEP Revit model for installation.
We produced a fully coordinated MEP Revit model for the development of this 2.5 ha site at Brunel Street Works, which has created 975 homes and a range of additional services for Canning Town.
We produced a fully coordinated MEP Revit model for installation.
MultiCAD produced a fully coordinated MEP Revit model including point cloud scan for a 10 year plant replacement of the court building.
We produced a fully coordinated MEP Revit model for installation.
We produced Coordinated M&E drawings for consultant.
Urbanest Nine Elms is a 33-storey student accommodation development in London SW8. We produced co-ordinated M&E drawings.
We produced/co-ordinated 2D & 3D M&E drawings using Revit and AutoCAD MEP.
Science Gallery is located at the foot of The Shard, moments away from London Bridge. We produced detailed co-ordinated M&E; drawings.
We produced detailed 3D co-ordinated M&E drawings using Revit.
We produced detailed 3D co-ordinated Refrigeration drawings using Revit.
We produced ductwork co-ordination drawings for KOBox – “Fight Club Meets Nightclub”.
We produced in depth 3D security design drawings using Revit.
We produced detailed 3D co-ordinated M&E drawings using Revit.